2020-08-12 09:29:55 source: Liu Jian
Before the 2022 Asian Games, a greenway will run along the Qiantang River, Fuchun River, and Xin'an River, with a total length of more than 1,000 kilometers. New progress has been made in a 10.8-kilometer greenway on the south bank of Fuchun River. People can ride along the greenway from Hangzhou's main urban areas to Tonglu County in the future.
This year, the first section of the project has been started. The starting point is near the Third Fuchun River Bridge, and the ending point is at the south side of the Dayuan River. The distance is about 1 kilometer. After the transformation of the viewing platform and tree pool, the site will be more beautiful and functional. Resting places will be set up opposite the viewing platform.
Near the beautiful riverside greenway, a new riverside road will be built in the future, which will improve the local traffic situation after it is opened to traffic.
(Compiled by Xu Yuhong, translated by Tao Mingzhou)
read more